ID: 31265 Engineer in the control centre of POSCO’s FINEX 3 plant Free download Keywords control roomironPOSCOSouth KoreaPohang SteelworksFINEXinnovationengineer Categories Production Process, Country, Producer, Facility, Ironmaking, People of Steel, South Korea, POSCO, Pohang Steelworks (POSCO) Related items Rails on the cooling bed The hot dip galvanising line, where steel sheet is coated with a protective layer of zinc to prevent rust Close-up of a hot rolled seamless pipe in production JSW motto in front of sculpture outside steelmaking facility Moving steel coils in the storage facility Stacks of steel beams in the shipping yard Seamless steel pipe ready for transportation Worker in the facility laboratory