ID: 31265 Engineer in the control centre of POSCO’s FINEX 3 plant Free download Keywords engineerinnovationFINEXPohang SteelworksSouth KoreaPOSCOironcontrol room Categories Pohang Steelworks (POSCO), Production Process, POSCO, South Korea, People of Steel, Ironmaking, Facility, Producer, Country Related items Storage at NLMK Pennsylvania (NLMK Group) Scrap metal and iron ore ready to be sorted and turned into new steel in the electric arc furnace Researcher in the facility laboratory Casting steel billets Exterior view of TenarisTamsa logo on pipe manufacturing facility. The building is LEED (Leadership in Energy and Environmental Design) certified. Workers walk in front of coke ovens. These ovens remove the impurities in coal to make pure carbon for use in the blast furnace Views of loading slabs onto ship for export at the facility port Hot-rolling at NLMK La Louvière