ID: 31301The charging ladle moving hot metal into a basic oxygen furnace to be made into steel Free downloadKeywords productionmeltshopladlechargingBOFBasic Oxygen furnacePohang SteelworksSouth KoreaPOSCOCategories Production Process, Pohang Steelworks (POSCO), POSCO, South Korea, Steelmaking, Facility, Producer, CountryRelated itemsControl centre of TenarisTamsa pipe manufacturing facility. The building is LEED (Leadership in Energy and Environmental Design) certified. Hot wire rod in the rolling mill Walking between water treatment tanks Handling of HDG at Novolipetsk (NLMK Group) Exterior view of TenarisTamsa pipe manufacturing facility. The building is LEED (Leadership in Energy and Environmental Design) certified. Exterior view of blast furnace Inspecting wire rod in storage Prepainted steel at Novolipetsk (NLMK Group)