Your browser does not support the video tag. ID: 31425 View of blast furance control centre Free download Keywords Pohang SteelworksSouth KoreaPOSCOVideoprocess controlironblast furnacecontrol room Categories Pohang Steelworks (POSCO), Production Process, POSCO, South Korea, People of Steel, Ironmaking, Facility, Producer, Country Related items Steel billet in production in the hot strip mill Handling at NLMK Indiana (NLMK Group) Operators monitoring screens in the logistics control centre View through coils of wire rod in the storage yard Producing rail track Two female employees make their way to the main entrance to begin the morning shift Hot rolling steel slab Scrap metal being sorted for recycling into new steel in the electric arc furnace