ID: 31593Production process of Quard and Quend heavy plates at NLMK Clabecq (NLMK Group) Free downloadKeywords plateNLMK GroupClabecqBelgiumQuardQuendCategories Production Process, Country, Producer, Facility, Casting, Belgium, Novolipetsk Steel (NLMK Group), NLMK Clabecq (NLMK Group)Related itemsOpening the blast furnace tap in order to take an iron sample Cycling past the facility power plant The seamless steel pipe production line Packaging stacks of sandwihced steel panels The interior of the blast furnace facility at HBIS Tangsteel Steel plate in the cooling bed Continously casting steel billets from the electric arc furnace directly above Coils of treated cold-rolled steel moved by an overhead crane operated by engineers in the control room