ID: 31611Production process of heavy plates at NLMK DanSteel (NLMK Group) Free downloadKeywords heavy platesNLMK GroupDanSteelCategories Production Process, Country, Producer, Facility, Coating and Finishing, Denmark, Novolipetsk Steel (NLMK Group), NLMK DanSteel (NLMK Group)Related itemsTransporting liquid iron by train from the blast furnace Scrap metal waiting to be recycled into new steel Baotou Steel main control centre Inspecting steel coils Drawings by workers’ children highlighting the importance of safety Cutting steel slab Inspecting steel coils Sorting cold rolled coils for storage