ID: 31707 Lime stone handling at Stagdok Free download Keywords raw materialsNLMK GroupNovolipetsklimestone Categories Producer, Facility, Steelmaking, Russia, Novolipetsk Steel (NLMK Group), Production Process, Country Related items Operators monitoring hot rolling process in the control centre Sorting cold rolled coils for storage Hot rolled coils in storage An engineer inspecting hot air injection unit in a blast furnace Stoilensky’s open-pit mine Exterior view of blast furnace Testing steel samples in the facility laboratory Close-up of wire rod on the cooling line