ID: 31722Biochemical waste water treatment facility at coke and chemical operations at the Lipetsk production site (NLMK Group) Free downloadKeywords Novolipetskprepainted steelHDGPPtransformer steelblast furnacedynamo steelslabpig ironhot rolled steelRussiacold-rolled steelcold rolled coilHRCCategories Facility, Steelmaking, Russia, Novolipetsk Steel (NLMK Group), Novolipetsk (NLMK Group), Production Process, Country, ProducerRelated itemsPreparing slabs for export at the facility port Storage of transformer steel at Novolipetsk (NLMK Group) Slab scarfing at NLMK Clabecq (NLMK Group) Close-up of wire rods Stacks of seamless pipe in storage Rolling process at NLMK La Louvière Control center in the TenarisTamsa pipes manufacturing facility LEED Exterior view of JSW logo on the cold rolling mill