ID: 31752Blast furnace 7 “Rossiyanka” at Novolipetsk (NLMK Group) Free downloadKeywords HRCNovolipetskprepainted steelHDGPPtransformer steelblast furnacedynamo steelslabpig ironhot rolled steelRussiacold-rolled steelcold rolled coilCategories Producer, Facility, Steelmaking, Russia, Novolipetsk Steel (NLMK Group), Novolipetsk (NLMK Group), Production Process, CountryRelated itemsThe water treatment centre at HBIS Tangsteel Exterior view of the Ternium logo on the side of the facility Pickling line in the painting facility Stacks of rebar used for reinforcing concrete View of exterior of steelmaking plant at night Scrap metal waiting to be recycled into new steel Close-up of steel wire rod Performing tests in the facility laboratory