ID: 31926Control room during testing at the Research and Development Centre Free downloadKeywords TenarisTamsaresearch and developmentcontrol roomtestingVeracruzMexicoCategories Country, Producer, Facility, People of Steel, Mexico, TenarisTamsa, TenarisTamsa (Tenaris), Production ProcessRelated itemsCasting steel billet Coils in storage Hot slab just before rolling Steel slab in production Engineer in the control centre of POSCO’s FINEX 3 plant Facility control room Rolling process at NLMK La Louvière Exterior view of TenarisTamsa logo on pipe manufacturing facility. The building is LEED (Leadership in Energy and Environmental Design) certified.