ID: 32502Crane operator at the facility port Free downloadKeywords slabportTerniumRio de JaneiroBrazilCategories Production Process, Country, Producer, Facility, People of Steel, Brazil, Ternium, Ternium Brazil (Ternium)Related itemsClose-up of wire rods View of engineer through cold rolled coil Handling process at NLMK La Louvière Close-up of cold rolled coil Train loaded with coils for delivery Continously casting steel billets from the electric arc furnace directly above Stoilensky’s open-pit mine A technician in front of the blast furnace wearing full flame retardant personal protective equipment (PPE)