ID: 32736Transporting stacks of slab by train Free downloadKeywords Facility ExteriorBrazilUSIMINASIpatingaCategories Brazil, USIMINAS, Ipatinga (USIMINAS), Production Process, Country, Producer, Facility, Steel PlantsRelated itemsBiochemical waste water treatment facility at coke and chemical operations at the Lipetsk production site (NLMK Group) Interior view of the steel production facility Pickling line in the painting facility Transporting liquid iron by train from the blast furnace Interior view of cold rolling mill Wire rod in production Interior of hot-dip galvanising line Coated steel coil coming off the production line