The blast furnace control room
Exterior and interior views of HBIS Tangshan facility
Rolling and storing coils
Inspecting H beams in storage
Seamless steel pipe ready for transportation
Inspecting rails loaded and ready for transport by train
Producing rail track
Tubes in production
Close-up of seamless pipe in storage
Inspecting wire rold coils