Your browser does not support the video tag. ID: 31428 Monitoring the ironmaking process in the FINEX plant control centre Free download Keywords control roomironprocess controlVideoPOSCOSouth KoreaPohang SteelworksFINEXengineerworkerscreens Categories Production Process, Country, Producer, Facility, Ironmaking, People of Steel, South Korea, POSCO, Pohang Steelworks (POSCO) Related items Biochemical waste water treatment facility at coke and chemical operations at the Lipetsk production site (NLMK Group) Cold rolled coils in storage Workers at the control panel of a galvanised steel production line Loading slabs for export onto ship at the facility port Casting steel billet High-tech mechanical testing process Interior view of TenarisTamsa pipe manufacturing facility. The building is LEED (Leadership in Energy and Environmental Design) certified. Operators monitoring hot rolling process in the control centre