ID: 32514 Loading slabs for export onto ship at the facility port Free download Keywords slabportTerniumRio de JaneiroBrazil Categories Production Process, Country, Producer, Facility, Final Product, Brazil, Ternium, Ternium Brazil (Ternium) Related items Storage of rebar at NLMK Kaluga, the next-generation EAF mill (NLMK Group) Delivering rail beams to customers Exterior of TenarisTamsa facility Wire rod in production Monitoring the cold rolling process from the control centre Interior view of TenarisTamsa pipe manufacturing facility. The building is LEED (Leadership in Energy and Environmental Design) certified. Wire rod coils being transported by crane around steel yard Plant operator in full personal protection equipment (PPE) deslagging the zinc bath at the hot-dip galvanising line