Control centre of POSCO’s FINEX 3 plant
Wire rod in storage
Operators in the logistics control centre
Operators monitoring screens in the logistics control centre
A technician in full personal protective equipment (PPE)
Taking a sample of hot iron from the blast furnace
Monitoring the blast furnace in the control room
An engineer inspecting hot air injection unit in a blast furnace
View of coated steel coils in storage, including coil being moved by crane operator