Your browser does not support the video tag.ID: 32751Steel slab ready for hot rolling Free downloadKeywords GerdauMinas GeraisSteel slabVideoCastingBrazilCategories Production Process, Country, Producer, Facility, Casting, Brazil, Gerdau S.A., Usina Ouru Branco (Gerdau S.A.)Related itemsInterior view of pipemaking facility with stacks of finished pipe stock Performing tests in the facility laboratory Inspecting coils in storage Extruding steel billet in the hot strip mill Monitoring the blast furnace in the control room Interior view of cold rolling mill Blast furnace hot air injection unit Storing wire rod coils d in a fully automated storage facility