Your browser does not support the video tag.ID: 32757Rolling and cooling steel slab Free downloadKeywords Castingfacility interiorBrazilGerdauMinas GeraisSteel slabVideoCategories Production Process, Country, Producer, Facility, Casting, Brazil, Gerdau S.A., Usina Ouru Branco (Gerdau S.A.)Related itemsJSW logo visible on blast furnace control room window High density sedimentation tank at HBIS Tangsteel water treatment centre Young students learning essential plant maintenance skills Casting steel billets Cutting steel slab Monitoring the blast furnace in the control room View of control centre and seamless pipe production in TenarisTamsa pipe manufacturing facility. The building is LEED (Leadership in Energy and Environmental Design) certified. Scrap metal and iron ore ready to be sorted and turned into new steel in the electric arc furnace