ID: 31674Handling process at NLMK La Louvière Free downloadKeywords NLMK GroupBelgiumcold rolled coilHRCNLMK La LouvièreCategories Producer, Facility, Final Product, Belgium, Novolipetsk Steel (NLMK Group), NLMK La Louvière (NLMK Group), Production Process, CountryRelated itemsWorker in the facility laboratory Coating the steel with a layer of paint at the paint line Engineer monitoring screens in the steel plant control centre Close-up of stack of finished pipe stock in storage In the blast furnace control room TenarisUniversity student demonstration of a robotic arm Blast furnace 7 “Rossiyanka” at Novolipetsk (NLMK Group) Crane operator at the facility port