Your browser does not support the video tag.ID: 31473Monitoring logistics process of finished steel products in the control centre Free downloadKeywords Pohang Steelworkslogisticscontrol roomVideoPOSCOSouth KoreaCategories Producer, Facility, Final Product, People of Steel, South Korea, POSCO, Pohang Steelworks (POSCO), Production Process, CountryRelated itemsWorkers walk in front of coke ovens. These ovens remove the impurities in coal to make pure carbon for use in the blast furnace Casting steel billet Hot wire rod in the rolling mill Cutting steel slab Hot strip mill control room Operating equipment to produce products in the hot rolling mill control room Cold rolled coils in storage Wire rod production