ID: 31277Hot steel being sprayed with water. This allows the rate at which it cools to be controlled Free downloadKeywords South KoreaPohang SteelworksHRslabhot rolled steelPOSCOCategories Production Process, Country, Producer, Facility, Hot Rolling, South Korea, POSCO, Pohang Steelworks (POSCO)Related itemsCoils in storage Loading slabs for export onto ship at the facility port Checking that rebar meets customer specifications Close-up of wire rods Close-up of steel wire rod Storage of transformer steel at Novolipetsk (NLMK Group) View of blast furance control centre Stoilensky’s open-pit mine