ID: 31265 Engineer in the control centre of POSCO’s FINEX 3 plant Free download Keywords engineercontrol roomironPOSCOSouth KoreaPohang SteelworksFINEXinnovation Categories People of Steel, South Korea, POSCO, Pohang Steelworks (POSCO), Production Process, Country, Producer, Facility, Ironmaking Related items Delivering rail beams to customers Wire rod in production Preparing slabs for export at the facility port Casting billet The first coil rolled at the hot strip mill A robotic arm takes a steel sample from an electric arc furnace Wire rod in storage Storage of rebar at NLMK Kaluga, the next-generation EAF mill (NLMK Group)