ID: 31926Control room during testing at the Research and Development Centre Free downloadKeywords testingVeracruzMexicoTenarisTamsaresearch and developmentcontrol roomCategories Production Process, Country, Producer, Facility, People of Steel, Mexico, TenarisTamsa, TenarisTamsa (Tenaris)Related itemsCoils of treated cold-rolled steel moved by an overhead crane operated by engineers in the control room Coating the steel with a layer of paint at the paint line View of control centre and seamless pipe production in TenarisTamsa pipe manufacturing facility. The building is LEED (Leadership in Energy and Environmental Design) certified. Hot slab in the reheating furnace in the plate mill Hot-rolling at NLMK La Louvière Exterior view of the facility dust collector Exterior view of blast furnace Storage of Quard and Quend heavy plates at NLMK Clabecq (NLMK Group)