ID: 31968Close-up of pipe welding Free downloadKeywords MexicoTerniumPesqueriaJuventudMonterreywelding pipeCategories Ternium Juventud (Ternium), Production Process, Country, Producer, Facility, Piping, Mexico, TerniumRelated itemsWire rod coils ready for storage Worker in the facility laboratory Quality control engineer inspecting coils of wire rod The interior of the blast furnace facility at HBIS Tangsteel Prepainted steel production process at NLMK Pennsylvania (NLMK Group) Blast furnace hot air injection unit Sculpture at Baotou’s facility entrance View through row of hot-dip galvanised coils.