ID: 32676 Workers in the facility laboratory Free download Keywords testingR&DBrazilUSIMINASIpatinga Categories USIMINAS, Ipatinga (USIMINAS), Production Process, Country, Producer, Facility, Testing and R&D, Brazil Related items Unloading iron ore pellets Radioing the central control room about pig iron production status from the blast furnace tap hole Control centre of TenarisTamsa pipe manufacturing facility. The building is LEED (Leadership in Energy and Environmental Design) certified. Testing steel strength in the facility laboratory A technician in front of the blast furnace wearing full flame retardant personal protective equipment (PPE) TenarisUniversity student demonstration of a robotic arm Scrap metal being sorted for recycling into new steel in the electric arc furnace Stack of finished steel wire rod coils in storage