ID: 32736 Transporting stacks of slab by train Free download Keywords Facility ExteriorBrazilUSIMINASIpatinga Categories Production Process, Country, Producer, Facility, Steel Plants, Brazil, USIMINAS, Ipatinga (USIMINAS) Related items Unloading steel scrap to be recycled in an electric arc furnace High density sedimentation tank at HBIS Tangsteel water treatment centre Storage of heavy plates at NLMK DanSteel (NLMK Group) Delivering rail beams to customers Wire rod in storage Wire rod production Wire rod casting View of blast furance control centre