Your browser does not support the video tag. ID: 31473 Monitoring logistics process of finished steel products in the control centre Free download Keywords control roomVideoPOSCOSouth KoreaPohang Steelworkslogistics Categories Production Process, Country, Producer, Facility, Final Product, People of Steel, South Korea, POSCO, Pohang Steelworks (POSCO) Related items Charging ladle moving hot metal into a basic oxygen furnace to be made into steel Stacks of steel slab in storage Preparing to load wire rod coils onto a ship Checking that rebar meets customer specifications Exterior view of blast furnace Galvanising steel sheet in the pickling line Cutting steel slab Research and development employees verifying a full scale sample in a R&D Center