ID: 31722Biochemical waste water treatment facility at coke and chemical operations at the Lipetsk production site (NLMK Group) Free downloadKeywords dynamo steelslabpig ironhot rolled steelRussiacold-rolled steelcold rolled coilHRCNovolipetskprepainted steelHDGPPtransformer steelblast furnaceCategories Production Process, Country, Producer, Facility, Steelmaking, Russia, Novolipetsk Steel (NLMK Group), Novolipetsk (NLMK Group)Related itemsWorking in the wire rod plant Cutting steel billet Control centre of TenarisTamsa pipe manufacturing facility. The building is LEED (Leadership in Energy and Environmental Design) certified. Transporting stacks of slab by train Close-up of wire rods Exterior view of the facility dust collector Blast furnace 6 at Novolipetsk (NLMK Group) Cold rolled coils in storage