ID: 31722Biochemical waste water treatment facility at coke and chemical operations at the Lipetsk production site (NLMK Group) Free downloadKeywords Russiacold-rolled steelcold rolled coilHRCNovolipetskprepainted steelHDGPPtransformer steelblast furnacedynamo steelslabpig ironhot rolled steelCategories Production Process, Country, Producer, Facility, Steelmaking, Russia, Novolipetsk Steel (NLMK Group), Novolipetsk (NLMK Group)Related itemsCrane operator moving steel coil into storage Delivering rail beams to customers Quality control engineer inspecting coils of wire rod Removing impurities from coal to make coke – pure carbon – for use in the blast furnace Hot-rolled products at NLMK La Louvière The entrance at HBIS Tangsteel Close-up of cutting and casting steel billets Cycling past the facility power plant