Skip to content
worldsteel
  • English
  • 中文
  • Español
Member extranet Data subscribers
MENU
  • English
  • 中文
  • Español
  • About us
  • About steel
  • Safety and health
  • Climate action
  • Wider sustainability
  • Our people
  • Steel is everywhere
  • Other topics
  • Media
  • Data
Member extranet Data subscribers
  1. Home
  2. Images
  3. worldsteel_Ternium_Brazil_crane operator_1.jpg

ID: 32502

Crane operator at the facility port

Free download
Keywords
slabportTerniumRio de JaneiroBrazil
Categories
Production Process, Country, Producer, Facility, People of Steel, Brazil, Ternium, Ternium Brazil (Ternium)

Related items

HBIS employees in front of the blast furnace

Cutting steel plate

Inspecting stacks of steel slab in storage

JSW motto with Corex plant in the background, where iron is directly reduced without the need for coke or sintering

Iron ore, the fundamental ingredient of steel, needs to be reduced in blast furnace to remove it of impurities

Wire rod coil ready to be loaded onto ship for delivery to customers

Delivering rail beams to customers

Scrap metal waiting to be recycled into new steel in the electric arc furnace

world steel association

World Steel Association AISBL
Registered office:
Avenue de Tervueren 270 – 1150 Brussels – Belgium
T: +32 2 702 89 00 – E: steel@worldsteel.org

Beijing office
C413 Office Building – Beijing Lufthansa Center – 50 Liangmaqiao Road
Chaoyang District – Beijing 100125 – China
T: +86 10 6464 6733 – F: +86 10 6468 0728 – E: china@worldsteel.org

© 2025 worldsteel | Terms of use | Privacy policy | Cookie policy | Sales policy | Sitemap | VAT Number BE 0406.597.373
constructsteel.org | worldautosteel.org | steeluniversity.org | worldstainless.org
worldsteel news

Sign up to receive our e-newsletter.
You can easily unsubscribe at any time.

Facebook Twitter LinkedIn Instagram YouTube Flickr RSS