Your browser does not support the video tag. ID: 32321 Coils of treated cold-rolled steel moved by an overhead crane operated by engineers in the control room Free download Keywords storagecoatingVideofinishingMexicoTerniumPesqueriasteelTernium Industrial Center Categories Production Process, Country, Producer, Facility, Coating and Finishing, Mexico, Ternium, Ternium Juventud (Ternium) Related items Slabs at Novolipetsk (NLMK Group) Baotou Steel main control centre Seamless steel pipes on cooling bed Testing steel samples in the facility laboratory Close-up of wire rod on the cooling line Exterior view of blast furnace Performing tests in the facility laboratory Researcher in the facility laboratory