Your browser does not support the video tag. ID: 32805 Loading slabs for export onto ship at the facility port Free download Keywords Videotransportationfinal productTerniumBrazilTernium Brazil Categories Production Process, Country, Producer, Facility, Final Product, Brazil, Ternium, Ternium Brazil (Ternium) Related items Wire rod coil ready to be loaded onto ship for delivery to customers Handling of HDG at Novolipetsk (NLMK Group) Preparing to load steel wire rods onto ship at the port Casting, torch cutting and cooling steel billets Steel plate being prepared for quality inspection Coils in storage Interior view of cold rolling mill Stack of finished steel wire rod coils in storage