ID: 31722 Biochemical waste water treatment facility at coke and chemical operations at the Lipetsk production site (NLMK Group) Free download Keywords cold-rolled steelRussiapig irondynamo steeltransformer steelPPHDGprepainted steelNovolipetskHRCcold rolled coilhot rolled steelslabblast furnace Categories Production Process, Novolipetsk (NLMK Group), Novolipetsk Steel (NLMK Group), Russia, Steelmaking, Facility, Producer, Country Related items Loading slabs for export onto ship at the facility port Stacks of seamless pipe in storage Stacks of steel slab in storage Radioing the central control room about pig iron production status from the blast furnace tap hole Hot steel plate Opening the blast furnace tap in order to take an iron sample Exterior view of blast furnace Cutting steel bars after continuous casting process