ID: 31238 Taking a sample of hot iron from the blast furnace Free download Keywords safety equipmentpersonal protective equipmentirontechniciantapping-off processPOSCOSouth KoreaPohang Steelworksquality control Categories Production Process, Country, Producer, Facility, Production at a Glance, Ironmaking, People of Steel, South Korea, POSCO, Pohang Steelworks (POSCO) Related items Wire rod in storage Drawings by workers’ children highlighting the importance of safety Control center in the TenarisTamsa pipes manufacturing facility LEED Steel plate in the cooling bed Rail finishing line Cooled wire rods in the rolling mill Production process of heavy plates at NLMK DanSteel (NLMK Group) Inspecting rails loaded and ready for transport by train